Energy Marshal – Data Center Construction
Job Summary
This position is ideal for an electrical safety professional with extensive experience managing hazardous energy control, Lockout/Tagout (LOTO) procedures, electrical isolation, and controlled energization activities on complex mission-critical construction projects.
The ideal candidate has previous experience serving as a designated Energy Marshal or in a comparable position with direct responsibility for electrical isolation and energization safety.
Job Overview
We are seeking experienced Energy Marshals for potential large-scale data center construction opportunities in the Atlanta, Georgia area.
This position is ideal for an electrical safety professional with extensive experience managing hazardous energy control, Lockout/Tagout (LOTO) procedures, electrical isolation, and controlled energization activities on complex mission-critical construction projects.
The ideal candidate has previous experience serving as a designated Energy Marshal or in a comparable position with direct responsibility for electrical isolation and energization safety.
Key Responsibilities
-
Oversee hazardous energy control and electrical isolation procedures.
-
Coordinate and verify Lockout/Tagout (LOTO) requirements during construction, testing, and commissioning.
-
Review energy isolation plans, switching procedures, and applicable energization permits.
-
Coordinate controlled energization activities with authorized personnel, electrical contractors, equipment manufacturers, and commissioning teams.
-
Verify appropriate electrical safety boundaries, isolation points, and documentation.
-
Ensure compliance with OSHA regulations, NFPA 70E, and project-specific electrical safety requirements.
-
Participate in pre-energization meetings, safety reviews, and readiness assessments.
-
Identify hazardous energy risks and address unsafe conditions.
-
Maintain detailed records of electrical isolation, testing, approvals, and release procedures.
-
Support safe transitions from construction through equipment testing, commissioning, and system turnover.
Required Qualifications
-
5+ years of electrical construction, electrical safety, commissioning, or critical power systems experience preferred.
-
Demonstrated responsibility for hazardous energy control and electrical isolation programs.
-
Strong understanding of NFPA 70E and OSHA electrical safety requirements.
-
Experience with medium-voltage distribution equipment, switchgear, transformers, and electrical power systems.
-
Familiarity with switching procedures, electrical isolation, and energization protocols.
-
Ability to interpret electrical one-line diagrams and identify isolation points.
-
Experience coordinating electrical safety activities across multiple contractors.
-
Strong communication, documentation, and risk-management skills.
Preferred Qualifications
-
Previous formal appointment as an Energy Marshal or Authorizing Energy Marshal.
-
Hyperscale data center construction or commissioning experience.
-
Experience managing electrical isolation boundaries and energization procedures.
-
Familiarity with UPS systems, generators, switchgear, and critical power distribution.
-
OSHA 30 certification and relevant electrical safety training.
What This Opportunity Offers
-
Highly competitive compensation based on qualifications.
-
Opportunities to work on major mission-critical construction projects.
-
High-responsibility electrical safety leadership role.
-
Exposure to sophisticated electrical infrastructure and commissioning operations.
-
Potential for long-term opportunities within the data center construction industry.